UDOT's Nov 3, 2026 letting: 3 proposals in 2 counties, led by bridge work
Salt Lake (2), Sevier (1) · 2 UDOT regions · bids due through Masterworks Contractor Bidding
The Utah Department of Transportation has 3 proposals posted for its bid opening on Nov 3, 2026. The work is spread across 2 counties in 2 of UDOT's four regions. Salt Lake (2) and Sevier (1) have the most proposals. By UDOT's own work-type labels, bridge (2) and bfp: us-89 over clear creek, 0d 764 (rehabilitation or replacement) (1) make up the largest share.
No addenda had been posted when this brief was generated. Check the proposal pages again before bidding, because addenda can come out up to the letting. Counting this one, our table has 3 advertised proposals for 2026 lettings.
Every proposal on the Nov 3, 2026 letting
| Proposal | County | Region | UDOT work type | Addenda |
|---|---|---|---|---|
| PIN 21297 | Salt Lake | 2 | BFP: Taylorsville City Bridge Replacement 035218F (New Bridge/Bridge Replacement) | |
| PIN 21732 | Salt Lake | 2 | BFP: 2200 W Bridge Replacement (035085F) (Rehabilitation or Replacement) | |
| PIN 21974 | Sevier | 4 | BFP: US-89 over Clear Creek, 0D 764 (Rehabilitation or Replacement) |
Where the work is, by region
What kind of work it is
UDOT labels each proposal with a major work type. Here is what those categories usually involve, and how many proposals on this letting fall into each:
- Bridge (2): bridge construction, widening, rehabilitation or repair: piling, substructure and superstructure concrete, structural steel, joints and bearings. Proposals: PIN 21297, PIN 21732.
- BFP: US-89 over Clear Creek, 0D 764 (Rehabilitation or Replacement) (1): work as described in the proposal documents. Proposals: PIN 21974.
The work type is only a label. The bid item list and plans for each proposal show the real quantities. Subcontractors and suppliers should price from those, not from the category.
How to bid
- Primes: each Contractor Zone listing says whether UDOT prequalification is mandatory. See our UDOT bidding guide.
- Advertisements: UDOT lists each project's bid opening, region, county, work category and an engineer's estimate range.
- Submitting: bids go in through Masterworks Contractor Bidding from Contractor Zone.
- Subcontractors and suppliers: our county hubs list the firms in each county, for example Salt Lake.
- Retention: UDOT's current listings say it will not hold retention, citing Utah Code § 13-8-5; see our lien and bond guide.
Key dates
- Nov 3, 2026: advertised letting (bids due through Masterworks Contractor Bidding per the proposal instructions).
- Oct 31, 2026: first of these proposals appeared on UDOT's letting page in our daily check.
- After the letting: UDOT posts bid results in Contractor Zone after the opening.
More: all upcoming lettings · county hubs · state procurement registration for agency work outside UDOT.
Spot an error? Email corrections to the editor. Facts in every story come from the sources listed above.